Switch From DI to Reverse Osmosis For Boiler Feed Water
Switching from DI to RO Boiler Feed Water: The Project Scope Complete Water Solutions was asked to provide a turnkey solution to replace the DI Water System. The current system consisted of Cation & Anion separate bed Deionization. The new system needed to provide low conductivity, hardness water @ 60 GPM Flow Rate. Why Switch [...]