A power plant located in Wisconsin contacted Complete Water Solutions after finding resin in the floor drain after a regeneration cycle. The deionization process is very important at the plant for safety reasons. Complete Water technicians were able to identify the source of the problem, a broken distributor system located internally in the tank. Until the distributor could be fixed, the plant could not operate with contaminated water.