A power plant located in Wisconsin contacted Complete Water Solutions after finding resin in the floor drain after a regeneration cycle. The deionization process is very important at the plant for safety reasons. Complete Water technicians were able to identify the source of the problem, a broken distributor system located internally in the tank. Until the distributor could be fixed, the plant could not operate with contaminated water.
Resin Replacement and Repair in Wisconsin

Resin Replacement and Repair in Wisconsin