When you need membranes changed and your only downtime is Saturday – Rest assured Complete Water Solutions will be there. We understand that some times that routine maintenance has to be done on weekends, evenings, and holidays. Complete Water Solutions understands the importance of making sure that you stick to your maintenance schedule. When it comes to Food, Pharma, and Beverage we understand the importance of sticking to the maintenance and sanitation schedules. We want to make sure that you get what you need when you need it. Complete Water Solutions was contracted to replace the RO Membrane Elements at a Food Manufacturing Facility. Every year, Complete Water Solutions takes out the old membranes and installs newly cleaned membranes. The old membranes are taken off-site, cleaned, dried, and preserved in a vac sealed bag with preservatives. The membranes are stored in a climate-controlled facility. While changing the RO membranes Complete Water Solutions changed over the permeate piping from Victaulic fittings to unions. This change while minimal allowed for betting sealing of gaskets. Complete Water Solutions removed CSM RE8040 Membranes and installed GE Osmonics AK8040F Membranes complete with NSF Certification. Complete Water Solutions logged all serial numbers and dated the machine with service date.